Single phase Grid Tie Inverter connected to three phase Bi Directional Net meter
Recently we installed a two 4 Kwh roof top solar power plant. Totaling to 8 Kwh. Each 4 Kwh system through a single phase GTI was connected to three phase phase meter for evacuating power. Both the GTIs were connected together and then to the three phase meter. After commissioning the system we notice rise in import. Earlier our consumption was arund 35-40 Kwh daily, which now the net meter shows 120+ on daily basis.
Whats wrong with our approach or the net meter is not configured/calibrated properly.
1 How do you view the daily kWh? From the overview page or some reports?
please give me a snapshot of the daily kWh, including the before data(35-40kWh) and now(120+).
2 How do you configure the net energy metering?
Normally, even if you do not set the net energy metering(NEM) mode properly, the daily consumption kWh would also reduce after you install the solar PV inverter(no matter single phase inverter or 3-phase inverter).
So the key of the problem would not be how to set the NEM mode, some other problem must exist.
The net meter installed for 3 phase is "Saral-305" , the meter's display shows a caution triangle with an exclamation mark within it blinking continuously at all times.
please answer my question one by one.
"
1 How do you view the daily kWh? From the overview page or some reports?
please give me a snapshot of the daily kWh, including the before data(35-40kWh) and now(120+).
2 How do you configure the net energy metering?
"